Fred Theiss's Album: Layout Photos

Photo 12 of 115 in Layout Photos

Takes lower level from 43" off the floor to 65" on the upper level.
10 comments
  • Rick Phipps and Dave Poor like this
  • Dwayne de Lung
    Dwayne de Lung Fred - Are you using "all-thread" rod w nuts to raise/space the levels? (on phone & cant see well) That is an excellent idea & completely adjustable!
    July 2, 2013
  • Dave Poor
    Dave Poor Exactly what I need to build. Is this a "kit" or did you design and build it yourself?
    May 18, 2016
  • Fred Theiss
    Fred Theiss Built it myself.
    May 18, 2016
  • Fred Theiss
    Fred Theiss Plywood for a base. I used homasote for roadbed. Two tracks and used threaded rod so I can adjust the grade. I tried to keep the grade less than 2%.
    May 18, 2016